banner

Products

Powder Metallurgy Diesel Engine Oil Pump Rotor

Powder Metallurgy Diesel Engine Oil Pump Rotor

Package Size 22.00cm * 22.00cm * 22.00cm Package Gross Weight 10.000kg Excellent powder metallurgy parts metallic sinter
SHARE

Description

Basic Info.
Model NO. ZKAB01
Type Oil Pump
Drive Hydraulic
Performance Automatic
Keywords 1 Powder Metallurgy Parts
Keywords 2 Nonstandard Parts
Package as Required
Process Powder Metallurgy
Transport Package as Required
Specification as Required
Trademark as Required
Origin Jiangsu
HS Code 8479909090
Production Capacity 50000 Pieces/Day
Packaging & Delivery
Package Size 22.00cm * 22.00cm * 22.00cm Package Gross Weight 10.000kg
Product Description

Excellent powder metallurgy parts metallic sintered parts
We could offer various powder metallurgy parts including iron based and copper based with top quality and cheapest price, please only send the drawing or sample to us, we will according to customer's requirement to make it. if you are interested in our product, please do not hesitate to contact us, we would like to offer the top quality and best service for you. thank you!
How do We Work with Our Clients
1. For a design expert or a big company with your own engineering team: we prefer to receive a fully RFQ pack from you including drawing, 3D model, quantity, pictures;2. For a start-up company owner or green hand for engineering: just send an idea that you want to try, you don't even need to know what casting is;3. Our sales will reply you within 24 hours to confirm further details and give the estimated quote time;4. Our engineering team will evaluate your inquiry and provide our offer within next 1~3 working days.5. We can arrange a technical communication meeting with you and our engineers together anytime if required.


Q1: What is the type of payment?
A: Usually you should prepay 50% of the total amount. The balance should be pay off before shipment.Q2: How to guarantee the high quality?
A: 100% inspection. We have Carl Zeiss high-precision testing equipment and testing department to make sure every product of size,appearance and pressure test are good. Q3: How long will you give me the reply?
A: we will contact you in 12 hours as soon as we can.Q4. How about your delivery time?
A: Generally, it will take 25 to 35 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order. and if the item was non standard, we have to consider extra 10-15days for tooling/mould made.Q5. Can you produce according to the samples or drawings?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.Q6: How about tooling Charge?
A: Tooling charge only charge once when first order, all future orders would not charge again even tooling repair or under maintance.Q7: What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.Q8: How do you make our business long-term and good relationship?
A: 1. We keep good quality and competitive price to ensure our customers benefit ; 2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.

Our Contact